Trishuli Valley Hydropower Powerhouse
Nuwakot, Nepal
Project Overview
A critical infrastructure project, our scope of work involved the complete design and construction of the powerhouse, intake channels, and concrete penstocks for the 45MW Trishuli Hydropower project. It required excavating over 80,000 cubic meters of mountain rock, applying heavy steel-reinforced shotcrete walls, and casting precision mass-concrete turbine foundations to support enormous vibrating loads.
Project Gallery
Zoom
Zoom
Project Specifications
Client / OwnerNational Hydro Energy Board
Construction Area150,000 sq. ft.
Completion DateMay 2026
Technologies Used
Heavy ShotcretingUnderground ExcavationMass Concrete CastingTurbine Foundation Engineering