infrastructure
Koteshwor-Jadibuti Corridor Bridge
Kathmandu, Nepal
Project Overview
To ease the daily gridlock between Koteshwor and Bhaktapur, Vajra constructed this 4-lane, 120-meter pre-stressed girder concrete bridge over the Hanumante river. The foundations involved sinking bored piles 25 meters deep into the soft riverbed. The project was completed two months ahead of schedule, facilitating smoother traffic flows for millions of commuters daily.
Project Gallery
Zoom
Zoom
Project Specifications
Client / OwnerDepartment of Roads, Nepal
Construction Area2.5 km stretch
Completion DateDecember 2025
Technologies Used
Pre-Stressed Concrete GirdersBored PilesAsphalt Concrete Overlay
Project Location Map